Bill of materials

Bill of materials

The quantities come from the single-line diagram, the yard layout and the calculations, so the bill of materials follows the design. Category names, words, units and default makes follow the standards set.

The bill of materials table with spares entered
Capabilities

Quantities, makes and output

You add the spares and the approved makes per line. Both apply at once, with no new design run.

Content
  • Bill of materials from the SLD, the yard layout and the calculations
  • Approved makes and spares per line
  • Library of approved makes, applied to the BOM
  • Selection linked to the SLD, the yard layout and the 3D model
Output
  • Output in XLSX and PDF
  • Stored per issued revision, with the document package
Document

Sample bill of materials

Documents of a sample project, generated by SubstationLayout and marked as samples. Not for construction.

  • Page 1 of the sample bill of materials
  • Page 2 of the sample bill of materials
  • Page 3 of the sample bill of materials
Bill of materialsSSL-C-BOM-001 · Rev 0 · 3 pages · PDF · 56 KB
Download