Busbar and breaker failure protection
A fault on a bus is fed by the circuits connected to it, and clearing it disconnects those circuits from the bus. A false trip of the bus protection disconnects them as well. This topic explains the differential protection of a bus, its low-impedance and high-impedance types, and the check zone that secures the bus protection of a double bus. It then explains breaker failure protection, which clears a fault when a breaker fails to open, with its retrip and its timing. It closes with what the design specifies for these protections.
Before this topic: Principles of protection · Bus schemes · Line protection
1Why a bus has its own protection
A fault on a bus can be cleared without a protection of its own. The remote breakers of the lines feeding the bus trip on their zone 2 or their time-delayed earth relays (Line protection, The zones of a distance relay). This is simple and economical, but the loads of the lines' remote substations are also lost. The time to clear the fault may also be intolerable (RUS Bulletin 1724E-300 §12.4.4.2).
A bus protection trips the breakers of the substation connected to the faulted bus, and only those. It must clear the fault within the network's maximum fault clearance time (Principles of protection, Requirements of protection). It must also be secure: a current transformer (CT) that saturates during an external fault must not cause a trip (Bus differential protection). The CEA Connectivity Regulations 2007 require "bus bar protection" at new substations of 220 kV and above (CEA Connectivity Regulations 2007, Schedule Part III, 1).
2Bus differential protection
A bus differential protection applies the differential principle to the bus, with CTs on the circuits connected to it (Principles of protection, The differential principle). It compares the current entering the bus with the current leaving it, and a difference above a threshold indicates a bus fault. It then trips the breakers connected to the bus (Behrendt, Costello and Zocholl §I).
Unlike a transformer, a bus needs no compensation of magnitude or phase angle, and it draws no inrush current. The difficulty is the saturation of the CTs. For a fault on a circuit outside the bus, the currents of the other circuits add up in the CT of the faulted circuit. That CT may saturate, and its secondary current then no longer represents the primary current (Current transformers, Saturation and its effect on protection). The difference appears as a false operate current. The low-impedance and the high-impedance relay overcome it without a time delay (Behrendt, Costello and Zocholl §I).
3Low-impedance bus differential
A low-impedance relay has a separate current input for each circuit of the bus, with a low impedance to the CT's secondary current. Its inputs can share the CTs with other relays and meters. Tap settings bring CTs of different ratios to a common base (Behrendt, Costello and Zocholl §II.A).
The relay forms the operate current and the restraint current of Principles of protection, Eq. (1) and Principles of protection, Eq. (2). It operates when the operate current exceeds a threshold and a set slope of the restraint current. The relay measures each circuit's current, so it can also detect a breaker failure and an end-zone fault, a fault between a breaker and its CT (Principles of protection, Overlap at the breaker). It needs an input for each breaker position on the bus, which can limit a future extension (Behrendt, Costello and Zocholl §II.A, §II.B).
4High-impedance bus differential
A high-impedance relay is connected across the CTs of all the circuits, which are wired in parallel (Figure 1). The paralleled CTs must have the same ratio. Through current circulates between the CTs and no current enters the relay. Any difference is forced through the relay's high internal impedance, typically 2000 Ω or more, and develops a voltage across it. The relay is set in volts, and its element is marked 87Z (Behrendt, Costello and Zocholl §III).
The setting must stay above the voltage that an external fault can develop across the relay. The worst case is a CT of the faulted circuit fully saturated, which gives no output and is a resistance in the circuit. The other CTs then drive their current through that CT's winding and its leads, and the relay measures the voltage drop across them:
The relay's setting is that voltage times a safety factor:
| voltage across the relay for an external fault with the faulted circuit's CT fully saturated | V | |
| voltage setting of the relay | V | |
| maximum external fault current through the circuit | A | |
| ratio of the CT, at the tap in use | ||
| resistance of the CT's secondary winding and its leads to the CT terminals | Ω | |
| one-way resistance of the lead from the junction point to the most distant CT | Ω | |
| lead factor, 1 for three-phase faults and 2 for single-phase-to-earth faults | ||
| safety factor, normally 1.5 or more |
The calculation is repeated for each circuit with its own maximum external fault current. The safety factor allows for future increases of the fault current. For an internal fault, the relay presents a near open circuit to the CTs, which would drive dangerous voltages. A metal-oxide varistor across the relay clamps the voltage (Behrendt, Costello and Zocholl §III.A).
The high-impedance relay is stable against CT saturation, and it is sensitive to a difference current. Its CTs must have the same ratio and matching accuracy ratings. It cannot detect a breaker failure or an end-zone fault, because the paralleled CTs lose the individual currents (Behrendt, Costello and Zocholl §III.B).
5The check zone
A double main bus connects each circuit to one of its 2 buses through its bus isolators (Bus schemes, Bus schemes of the IEC + CEA / CBIP set). The bus protection has a zone for each bus, and the circuit's current belongs to the zone of the bus it is connected to. The relay assigns the currents to the zones from the auxiliary contacts of the isolators. When a circuit's 2 bus isolators are both closed, the buses are joined solidly, and the 2 zones merge into one (Martin and others §III.D).
A wrong auxiliary contact assigns a current to the wrong zone. A healthy zone then shows a false operate current, and the relay could trip a bus. The check zone guards against it. It treats the whole substation as a single node and sums the currents of the circuits leaving the substation, regardless of the isolators' positions. A fault is indicated only when the check zone's currents do not add to zero (Martin and others §III.D). A trip of a bus zone is supervised by the check zone: an operate current in a bus zone with none in the check zone points to a faulty isolator contact.
The low-impedance relay suits a double bus, because it reassigns the currents to the zones in its logic without changing the CT wiring. The single bus, the one-and-a-half breaker and the double-bus double-breaker arrangements have fixed zones and suit the high-impedance relay where suitable CTs are available (Martin and others §IV).
6Breaker failure protection
A breaker can fail to clear a fault. Its mechanism may fail to open, its trip coil or trip circuit may fail, or it may open but fail to interrupt the current (PSRC summary of the breaker failure guide §II). The 2 main failure modes are the failure to trip and the failure to clear. Clearing the fault then needs the breakers adjacent to the failed one, those that feed the same fault through it.
Local breaker failure protection trips those breakers from the same substation. The CEA calls it local breaker backup (LBB) protection, and requires it at substations of 220 kV and above (CEA Connectivity Regulations 2007, Schedule Part III, 2). It is faster, more sensitive and more selective than the remote backup of the next substations (Principles of protection, Main and backup protection).
A basic breaker failure scheme has these parts (PSRC summary of the breaker failure guide §III):
- Initiation. A protective relay that trips the breaker also starts the breaker failure protection, the breaker failure initiate signal.
- Current detector. An overcurrent element, 50BF, monitors the current in each phase of the breaker. Its reset shows that the breaker has interrupted the current. The breaker's auxiliary contacts can serve where the fault current is too small.
- Timer. The timer starts when the initiate signal and the current detector are both picked up. If the current is still present when the timer expires, the breaker has failed.
- Trip of the adjacent breakers. The timer's output operates a lockout relay, 86BF, or a tripping relay, 94. They trip the adjacent breakers of the substation and block their closing. A transfer trip sends the trip to the remote end of a line, and blocks its reclosing.
The CEA Grid Standards Regulations 2010 require the breaker fail protection to trip the other breakers in the concerned bus section within the next 200 ms. This applies when a breaker has not cleared the fault within the maximum fault clearance time (CEA Grid Standards Regulations 2010, Reg. 3(1)(e)).
7Retrip and backup trip
A scheme with retrip sends a second trip to the failed breaker itself, from a separate output, before it trips the adjacent breakers (PSRC summary of the breaker failure guide §III.B). The retrip is issued with a margin such that, when the breaker opens on it, the current detector resets before the timer expires. It covers a failure to trip from loose or shorted trip circuit wiring or a trip coil that does not work. It also prevents a breaker failure trip from a false initiation, such as an error during relay testing or a transient on the direct current (DC) control wiring. Most utilities issue the retrip with no delay, and some add a short delay so that a breaker that opened on the retrip can be identified.
The trip of the adjacent breakers is the backup trip, or backtrip. It disconnects equipment that is not faulted, so its security and selectivity are as critical as its speed (Atienza and Moxley §I).
8Breaker failure timing
The breaker failure timer must outlast the slowest normal clearing of the breaker, with a margin. The total clearing time must stay within the limits of the network. Figure 2 shows the sequence of a normal clearing and of a breaker failure. Atienza and Moxley give the timer's delay as:
| delay of the breaker failure timer | cycles | |
| maximum clearing time of the breaker | cycles | |
| time of the breaker failure relay to detect the open phase | cycles | |
| security margin | cycles | |
| maximum operating time of the trip output contact | cycles | |
| minimum time of the breaker failure initiate signal | cycles |
Their example takes a 3-cycle breaker, 1.5 cycles of open-phase detection and a 2-cycle margin. With 0.36 cycles of output contact time and 0.5 cycles of initiate time, the minimum delay is 3 + 1.5 + 2 + 0.36 − 0.5 = 6.36 cycles. The example sets the timer at 6.5 cycles (Atienza and Moxley §II, Eq. 2, Eq. 4). The total clearing time of a breaker failure adds the primary relay's time, the initiate time, the timer, the distribution of the trip and the adjacent breakers' clearing time. Their example sums the primary relay's 1.5 cycles, the contact and input times of 0.36, 0.5 and 0.25 cycles, the timer's 6.5 cycles, 0.36 and 1.0 cycles to distribute the trip and the adjacent breakers' 3.0 cycles. The total is 1.5 + 0.36 + 0.5 + 0.25 + 6.5 + 0.36 + 1.0 + 3.0 = 13.47 cycles (Atienza and Moxley §II, Eq. 4). RUS 1724E-300 §12.4.4.3 gives a timer setting usually in the range of 10 to 20 cycles.
9In the design
SubstationLayout sets no bus or breaker failure protection. It specifies the bus scheme and the CTs that these protections use, and lists the grid code's requirement on the compliance checklist.
Bus scheme. The default project's high-voltage (HV) yard is a double main bus at 220 kV, with buses rated 3150 A (Bus schemes). Each circuit connects to one bus through its bus isolators, so a bus protection of this yard needs the zone selection and the check zone of The check zone.
CTs. The design's bay has one set of CTs, between the circuit breaker and the line or transformer isolator (Bays and their equipment, Line bay). A bus protection fed from these CTs includes the breaker in the bus zone. A fault between the breaker and the CT is then an end-zone fault, which the bus protection and the breaker failure logic clear with a transfer trip of the remote end (Principles of protection, Overlap at the breaker). The CT's 5 cores, 0.2S, 0.2S, 5P20, 5P20, PS, include a class PS core, the class defined by its magnetic characteristic that differential protection most often uses (Current transformers, Accuracy classes).
Compliance checklist. The CEA / Indian checklist's Protection item cites Schedule Part III, 1 to 3, of the CEA Connectivity Regulations 2007, which require the bus protection and the LBB protection at 220 kV and above. The item reads Needs your answer until the user answers it (Principles of protection, In the design).
- Explain why remote clearing of a bus fault is often not acceptable.
Answer 1
The remote breakers trip on their delayed zones, which also removes the loads of the remote substations and may take an intolerable time (Why a bus has its own protection).
- Compare low-impedance and high-impedance bus differential relays.
Answer 2
The low-impedance relay has an input per circuit and can share CTs of different ratios, and the high-impedance relay is set in volts across paralleled CTs of one ratio (Low-impedance bus differential, High-impedance bus differential).
- Give the voltage setting of a high-impedance relay in terms of the external fault.
- Explain the role of the check zone of a double bus protection.
Answer 4
It sums the currents leaving the whole substation regardless of the isolators, so a false operate current from a wrong isolator contact does not trip a bus (The check zone).
- Calculate the breaker failure delay for a 3-cycle breaker with the times of the example.
Answer 5
By Eq. (3) the minimum delay is 3 + 1.5 + 2 + 0.36 − 0.5 = 6.36 cycles, and the example sets the timer at 6.5 cycles (Breaker failure timing).
- State what the CEA Grid Standards Regulations 2010 require of the breaker fail protection.
Answer 6
It trips the other breakers of the bus section within the next 200 ms when a breaker has not cleared the fault within the maximum fault clearance time (Breaker failure protection).
[1]RUS Bulletin 1724E-300, Design Guide for Rural Substations.
[2]CEA Connectivity Regulations 2007, Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007.
[3]CEA Grid Standards Regulations 2010, Central Electricity Authority (Grid Standards) Regulations, 2010.
[4]Behrendt, Costello and Zocholl, Considerations for Using High-Impedance or Low-Impedance Relays for Bus Differential Protection. §III.A, Eq. 1; §III.A, Eq. 2.
[5]Martin and others, Bus Protection Considerations for Various Bus Types.
[6]PSRC summary of the breaker failure guide, Summary of Revision, IEEE C37.119-2016, Guide for Breaker Failure Protection of Power Circuit Breakers.
[7]Atienza and Moxley, Improving Breaker Failure Clearing Times. §II, Eq. 1.
[8]IEEE C37.2-1996, Standard Electrical Power System Device Function Numbers.
[9]IEC 60050-441, International Electrotechnical Vocabulary, Part 441: Switchgear, controlgear and fuses.
Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.