Outdoor lighting and security
A substation's outdoor lighting lets the operator move, switch and inspect at night, and its security items control who enters the fenced area. The design places floodlights on the gantry towers, the lightning masts and the firewalls, and road lights on poles along the roads. It then checks the horizontal illuminance on the ground point by point against a target average and a target uniformity, and adds or removes fittings until the areas meet them. This topic explains the fittings, the targets, the beam model and the equations of the check, and the security items the design places with the lighting.
Before this topic: Yard layout · Roads, trenches and buildings
1The lit areas and their targets
The illuminance check covers the areas of the yard where people work at night. A high-voltage (HV) switchyard is one area: the main yard between the internal road and the gantry, across the buses. The transformer row between the internal road and the interconnecting transformer (ICT) road is another. So are the outdoor medium-voltage (MV) yard and the static var generator (SVG) area where the project has them. The peripheral road is checked along its centre line (Roads, trenches and buildings, Roads).
Each area and the road meet 2 targets. The average horizontal illuminance on the ground is at least 20 lux. The ratio of the minimum to the average, the uniformity, is at least 0.3. Both targets come from the illumination specification of a POWERGRID substation package, which sets 20 lux on the balance area of the switchyard and on the roads (BHEL TB-393-316-012 §1.2). The same clause requires a minimum to average ratio of not less than 0.3 and a maintenance factor of 0.65 for the outdoor design.
EN 12464-2 gives the European values for outdoor work places. Its Table 5.11, for power, electricity, gas and heat plants, gives 20 lux and a uniformity of 0.25 for the handling of service tools (row 5.11.2), as licht.wissen 13 reproduces the table. The design's 0.3 meets that row. Row 5.11.1 gives 5 lux for pedestrian movements within electrically safe areas. The design reports the average on the open ground inside the fence, outside the lit areas and the roads, with no target.
On the ANSI / IEEE set the targets are the levels of the National Electrical Safety Code (NESC) 2007, Table 111-1. Rule 111A recommends them as levels maintained on the task. They are 22 lux average horizontal in the substation's lit areas, 22 lux vertical on the disconnects, and 5.5 lux on a roadway not bordered by buildings, the peripheral road. RUS Bulletin 1724E-300 gives 1 to 2 foot-candles in equipment areas and leaves the yard lighting design to the engineer (§15.1.3.3). NESC and RUS give no uniformity, so the design reports the minimum and the minimum / average with no target, and the verdict follows the averages.
2The fittings and where they stand
The fittings are light-emitting diode (LED) luminaires of 3 ratings, from the outdoor fittings of the POWERGRID Lighting System specification (Annexure-II). The floodlight of type FL-2 takes at most 250 W and gives at least 23 000 lm. The floodlight of type FL-1 takes at most 150 W and gives at least 14 000 lm. The street light of type SL-L1 takes at most 45 W and gives at least 4000 lm. The specification requires the ingress protection rating IP65 for the 3 types.
On the ANSI / IEEE set no standard sets a fitting's wattage, so the design names the fittings by their lumens. It takes the ratings of a maker's stock LED floodlight family that replaces 400 W, 250 W and 150 W high-intensity discharge lamps (Acuity Lithonia TFX LED sell sheet). The floodlight on the structures and the shielding masts gives 25 600 lm at 188 W, the one at the transformers 13 200 lm at 94 W, and the pole-top area light on the roads 7300 lm at 54 W. The poles are 25 ft high. RUS Bulletin 1724E-300 names pole-top or bracket luminaires (§15.1.3.3), notes that shielding masts may carry the lighting (§4.7.3.3), and switches the exterior lights with a contactor under photoelectric control (§15.1.3.2, §15.1.3.3). The maintenance factor is the design's 0.7.
The specification mounts the switchyard's fittings on the gantry structures and on the lightning masts available, and at 765 kV on the towers at 28 m (POWERGRID Lighting System specification §2.2). Other outdoor areas take street lighting, lighting poles and nearby buildings, and the transformers and reactors take floodlights on their firewalls. The mounting structures are prefabricated and hot dip galvanised (POWERGRID Lighting System specification §2.2). The design places the fittings as follows:
- HV switchyard. One 250 W floodlight per gantry and shield-wire tower of the lightning protection step (Masts and shield wires), at the yard's gantry beam level and at least 1 m below the tower's top, at 28 m in a 765 kV yard.
- Other areas. One 250 W floodlight per lightning mast in or within 5 m of the transformer row, the MV yard or the SVG area, 5 m below the mast's top.
- Transformers and reactors. Two 150 W floodlights per tank on the firewalls beside it. Without a firewall they stand on the support of the tank's camera (Security systems), at 15 m on a mast or tower.
- Roads. One street light per galvanised street-lighting pole of 6 m, 1.1 m from the road's edge (POWERGRID Lighting System specification §6.7: approximately 1000 mm to 1200 mm). The poles run along the peripheral road at most 30 m apart, and along the internal and ICT roads on their south side.
A floodlight on a tower or mast is aimed at the point of its area's centre line nearest its support. A road pole moves along its road to the nearest place 1 m clear of the towers, masts, pits, firewalls, the building and the gate openings. A pole with no such place is left out. On the internal road the poles stand in the gaps between the transformers' soak pits.
3The beam model
The check needs the luminous intensity of a fitting in the direction of the points it lights. A supplied fitting has its own photometric file, measured by its maker. Before the fittings are bought, the design takes a model of the beam that is symmetric about the fitting's axis. The intensity at the angle from the axis is the intensity on the axis times a power of the cosine, .
The exponent sets the beam's width. At the half-intensity angle the intensity is half of , so . Taking logarithms gives . The design takes = 30° for a floodlight, which gives = 4.82. It takes 60° for a street light, which gives = 1, a cosine distribution. These angles and the model are the design's own until the fittings' photometric files replace them.
The beam must emit the fitting's rated luminous flux . A solid angle lies between the cones at and . The flux of the beam over the hemisphere in front of the fitting is the integral of the intensity over that solid angle, . Solved for the intensity on the axis, . A 250 W floodlight of 23 000 lm has = 21 300 cd. A street light points straight down. A floodlight's axis points at its aim, at most 60° from straight down, so a far aim does not throw the beam towards the horizon.
4The point-by-point method
The point-by-point method calculates the illuminance at a point from the intensities of the fittings towards it, by the inverse square law and the cosine law (Baliga, Luminaires technical information p. 3). It gives the illuminance at a point on a surface of any orientation, horizontal on the ground or vertical on the equipment. The illuminance on a plane falls with the square of the distance to the source and with the cosine of the angle of incidence.
| illuminance at the point | lux | |
| luminous intensity of the fitting towards the point | cd | |
| angle of incidence, from the normal of the plane | ° | |
| distance from the fitting to the point | m | |
| mounting height of the fitting above the ground | m | |
| horizontal distance from the fitting to the point | m | |
| horizontal illuminance on the ground | lux | |
| angle from the fitting's axis | ° | |
| exponent of the beam model | 1 | |
| rated luminous flux of the fitting | lm | |
| maintenance factor | 1 |
On the ground the normal is vertical, so for a fitting at the height . The horizontal illuminance at a point is the sum over the fittings, times the maintenance factor = 0.65. The maintenance factor allows for the fall of the light output with the fittings' ageing and soiling, and the value is the specification's (BHEL TB-393-316-012 §1.2). The horizontal illuminance is , over the fittings .
The design calculates at the centres of a 2 m grid over a lit area, and at points 2 m apart along the peripheral road's centre line. The average and the minimum of an area are those of its points, and the uniformity is the smallest point's illuminance over the average. The lux map of the Lighting tab shows the same sum in cells of 4 m inside the fence.
Given: a 23 000 lm floodlight on a gantry tower of the default project's HV switchyard, as placed, at 15.5 m and aimed at a point 34.5 m away on the ground. Its beam has = 4.82, and = 0.65.
Intensity on the axis by the beam model of The beam model:
Distance and angles: = 37.8 m, and = 0.410. The aim lies 65.8° from straight down, beyond the limit of 60°, so the axis is held at 60° in the same vertical plane. The aim is then = 5.8° off the axis.
Intensity towards the aim by the beam model:
Illuminance by Eq. (1), with the maintenance factor:
Result: The floodlight alone gives 3.9 lux at its aim, a point on the yard's centre line. The fittings on the other towers and masts add to it.
5The lumen-method estimate
The lumen method gives the average illuminance of an area from the number of fittings, their lamp flux, a coefficient of utilisation and a light loss factor (Baliga, Luminaires technical information p. 3). The coefficient of utilisation is the share of the lamp's flux that reaches the working plane. The light loss factor is the maintenance factor. The method needs the fittings' flux and no photometric file.
| number of lamps per luminaire | 1 | |
| number of luminaires | 1 | |
| initial rated lamp flux | lm | |
| light loss factor, the maintenance factor | 1 | |
| coefficient of utilisation, the utilisation factor | 1 | |
| area to be lit | m² |
The source writes for the lamps per luminaire, which this topic writes to keep for the beam's exponent. With one lamp per fitting ( = 1), , and , the number of floodlights for a target average is . The design reports this estimate per area with = 0.5, its own value, beside the result of the check. The lumen method assumes an even pattern of fittings over the area. It gives no uniformity, and floodlights on the yard's edges throw part of their flux outside it. The point-by-point check determines the fittings.
Given: the default project's HV switchyard of 72.0 m by 70.0 m, = 5040 m², a target of 20 lux, floodlights of 23 000 lm, = 0.5 and = 0.65.
Estimate:
Result: The estimate is 14 floodlights, rounded up. After the check, 10 floodlights of 23 000 lm light the yard, with the light of the transformer row's and the road's fittings that spills into it.
6The check and its adjustment
The check compares each area and the road with their targets and changes the fittings where one falls short. It measures the light the areas and the road lack together. For an area or the road, that is the shortfall of the average plus the shortfall of its points below 0.3 times the larger of the target and the average, taken as a mean over its points. Both are a share of the target, and the measure is their sum over the areas and the road.
- Floodlights on the supports. For an area short of a target, the design evaluates a 250 W floodlight aimed at the area's darkest point on the 6 nearest free towers and masts, with at most 3 floodlights per support. It keeps the one that leaves the areas and the road the least light short, where it cuts the measure by at least 0.05 lux divided by the area's target, or by half of the measure where that is smaller.
- Lighting masts. Where no support cuts the measure by that much, the design adds a lighting mast on one of the lightning masts' sites nearest the darkest point, at least 3 m from another support. The mast is as high as the tallest lightning mast, or 25 m where the yard has none.
- Removal. The design removes the 250 W floodlights whose removal leaves the measure no greater and no area that meets its targets short.
- Road spacing. Where the peripheral road falls short, the spacing of its poles is cut by a third at a time, to 10 m at least. The removal of step 3 then runs once more.
The design repeats steps 1 to 3 over the areas, at most 4 passes, until a pass changes nothing, since an area's light spills into its neighbours. Step 4 follows the passes. For the default 220 kV project, the table below gives the results as placed and after the check. As placed, the HV switchyard's uniformity, the transformer row's uniformity and the peripheral road's average and uniformity fall short. The check adds 4 floodlights, removes 6 and needs no lighting mast. It shortens the peripheral road's spacing to 13.3 m, which adds 26 road lights. The project ends with 24 floodlights and 55 road lights, and the open ground averages 8.0 lux.
| Area | Average as placed | Min / avg as placed | Average after | Minimum after | Min / avg after | Result |
|---|---|---|---|---|---|---|
| HV switchyard | 23.1 lux | 0.23 | 20.4 lux | 7.7 lux | 0.37 | Complies |
| Transformer row | 41.8 lux | 0.25 | 31.3 lux | 11.7 lux | 0.37 | Complies |
| SVG and filter area | 48.6 lux | 0.61 | 44.4 lux | 22.2 lux | 0.50 | Complies |
| Peripheral road | 12.6 lux | 0.08 | 20.2 lux | 8.1 lux | 0.40 | Complies |
7Operating points and portable panels
An operator reads and works a circuit breaker or an isolator (disconnector, IEC 60050) on its vertical faces, which the horizontal illuminance on the ground does not describe. The design reports, for information, the vertical illuminance at 1.5 m at the circuit breakers and isolators of the HV yards. It gives the best-lit of 4 faces, north, south, east and west, and counts the directions of the fittings that give the point 2 lux or more. Light from 2 directions at right angles or wider apart lights the equipment without a deep shadow on the far side.
The reference value is 50 lux. An illumination specification for a 765/400 kV substation extension sets 50 lux on the vertical surfaces of the power transformers, circuit breakers, disconnecting switches and marshalling kiosks (BHEL TB-407-316-006 §1.2). The POWERGRID package specification sets 50 lux on the main equipment at its first level (BHEL TB-393-316-012 §1.2). For the default 220 kV project the best-lit faces of its 17 operating points receive 10.7 lux to 34.7 lux, and 16 of them are lit from 2 directions.
The yard's fixed lighting is not sized for that vertical level. Work at the equipment takes task lighting: the POWERGRID specification supplies a portable floodlight panel for the maintenance of the substation, with an FL-2 fitting (POWERGRID Lighting System specification §2.2). The design lists 1 portable panel per HV switchyard and 1 for the other areas in the bill of materials.
8Security systems
The security items control the entry to the fenced area and watch it. They stand at the main gate, on the fence, at the building's doors and at the transformers. A utility's substation specification lists a video monitoring system and an access control system among the systems of the substation (POWERGRID GTR Annexure-G, items I.06 and I.09). The positions, the types and the counts below are the design's own.
- Gates and room. A personnel gate 1.2 m wide stands 1 m east of the 6 m main gate, as a separate gate for people and for equipment (OPTCL Technical Specification E-6 §15.2). A security room of 3 m by 3 m in reinforced cement concrete (RCC) stands 1 m outside the fence.
- Boom barrier. A motorised barrier 4 m outside the fence closes the main gate's opening with an arm of 6 m at 1.0 m.
- Fixed cameras. One camera per fence corner, 1 m inside it and aimed at the centre of the fenced area. One camera per outside door of the control building, on the wall at 3 m. One camera per transformer and reactor, aimed at the tank.
- Gate camera. A pan-tilt-zoom camera on a pole 6 m west of the main gate watches the gate.
- Card readers. A proximity-card reader at the personnel gate and at the building's outside doors. The access control panel and the network video recorder stand in the control and relay room.
A camera off the building mounts on a lightning mast or shield-wire tower within 5 m of its place, or else on its own galvanised pole of 6 m. The default 220 kV project has 9 cameras, 2 of them on lightning masts, and 3 card readers. The yard plan draws a fixed camera's field as a sector of 60° to 40 m, and the gate camera's reach as a circle of 30 m. The fields show coverage only, and the bill of materials specifies the cameras by type, not by lens.
On the ANSI / IEEE set the security items are a project option, Security systems on the Site & soil page, off on a new project. IEEE 1402 is a guide to the physical security of substations against unauthorized access, theft and vandalism, and it leaves the measures to the owner's assessment. NERC CIP-014-3 requires a physical security plan for the transmission stations it covers (requirement R5 of the standard), and names no camera, reader or barrier. With the option on, the design places the items above at the same positions, with the sizes in feet. The fence takes a safety sign at the personnel gate, as at each entrance (NESC 2007, Rule 110A1).
9In the design
The lighting and its check belong to both standards sets, each with its own fittings and targets. The security items belong to the IEC + CEA / CBIP set and, as the Security systems option, to the ANSI / IEEE set. The Yard layout step shows the check on its Lighting tab: the results per area as placed and after, the fittings, the operating points and the lux map. The outdoor lighting calculation report gives the same results with the equations of The point-by-point method and The lumen-method estimate.
The yard plan draws the fittings and the lighting masts on the layer LIGHTING and the cameras' fields on the layer CCTV, and the sheet layers and a Drawing Exchange Format (DXF) file can hide either. The yard sheet carries an elevation of the main gate where its margin has room. The 3D model has the layers Lighting and Security. The bill of materials lists the fittings, the poles, the brackets, the lighting distribution boards, the cable and the portable panels, and the security items.
The auxiliary loads take the fittings after the check: the floodlights' rated watts, 5.60 kW for the default project, and the road lights at 45 W per light, 2.48 kW. The compliance checklist's lighting item complies when the areas and the road meet both targets. It does not comply when an average falls short, and needs the engineer's review when the averages are met and a uniformity falls short. On the ANSI / IEEE set the check also lights the disconnects to 22 lux vertical, aiming a floodlight at a disconnect below it, and its checklist item needs the engineer's review when a disconnect stays below.
10Common errors and checks
The common errors in the lighting of a yard come from the quantity checked and from the fittings assumed.
- The average alone. An area can meet its average with dark gaps between the floodlights. Check the minimum to average ratio as well (The lit areas and their targets).
- The lumen method as the design. The estimate assumes an even pattern and gives no uniformity. Check the point-by-point result (The lumen-method estimate).
- No maintenance factor. The light of new, clean fittings overstates the light in service. Check that the sum carries (The point-by-point method).
- The model beam as the supplied fitting. The beam model stands in for the photometric file. Check the supplied fitting's file against the check before construction (The beam model).
- Horizontal light at the equipment. The illuminance on the ground gives little information on the light on a breaker's vertical faces. Check the operating points and the task lighting (Operating points and portable panels).
- State the 2 targets of a lit area and their source.
Answer 1
An average of 20 lux and a minimum to average ratio of at least 0.3, from the illumination specification of a POWERGRID substation package (The lit areas and their targets).
- Derive the intensity on the axis of a beam that emits the flux .
Answer 2
The flux over the hemisphere is , so (The beam model).
- Calculate the illuminance of the example floodlight at its aim.
- Explain why the lumen method does not determine the floodlights of an area.
Answer 4
It assumes an even pattern of fittings and gives no uniformity, while the floodlights stand on the yard's edges and throw part of their light outside it (The lumen-method estimate).
- Name the steps the check takes when an area falls short of a target.
Answer 5
It adds a floodlight on a free tower or mast, or a lighting mast where no support helps enough, and removes the floodlights no area needs. After the passes it shortens the peripheral road's spacing (The check and its adjustment).
- Explain why the design reports the vertical illuminance at the operating points.
Answer 6
An operator works a breaker or an isolator on its vertical faces, which the horizontal illuminance on the ground does not describe (Operating points and portable panels).
[1]POWERGRID Lighting System specification, Technical Specification, Section: Lighting System.
[2]BHEL TB-393-316-012, Technical Specification for Illumination System.
[3]BHEL TB-407-316-006, Technical Specification of Illumination System.
[4]licht.wissen 13, licht.wissen 13: Outdoor Workplaces.
[5]Baliga, Luminaires technical information, Luminaires: technical information. p. 1; p. 3.
[6]POWERGRID GTR Annexure-G, Section: General Technical Requirements (GTR).
[7]OPTCL Technical Specification E-6, Technical Specification E-6, Civil Works.
[8]EN 12464-2, Light and lighting: Lighting of work places, Part 2: Outdoor work places.
[9]IEC 60050-441, International Electrotechnical Vocabulary, Part 441: Switchgear, controlgear and fuses.
[10]IEEE 1402-2021, IEEE Guide for Physical Security of Electric Power Substations.
[11]NERC CIP-014-3, CIP-014-3, Physical Security.
[12]ANSI C2-2007, National Electrical Safety Code.
[13]RUS Bulletin 1724E-300, Design Guide for Rural Substations.
[14]Acuity Lithonia TFX LED sell sheet, Lithonia Lighting TFX LED Floodlight.
Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.