Control and the control room

The switching devices of a substation are operated from several places: from a control centre far away, from the substation's control room, from a panel beside the bay's relays, or at the device itself in the yard. This topic explains these control positions and the rule that determines which one has control. It describes the control and relay panels, the control room and the building that holds it, and the direct current (DC) supply on which the control circuits depend. It closes with the control building, the DC feeders and the station service loads the design gives a project.

Before this topic: Bays and their equipment · Interlocking between the devices of a bay

1Control positions and their priority

A high-voltage (HV) switching device can be operated from 4 levels, which Figure 1 shows. A remote control centre operates it over a communication link. In the substation, an operator uses the station's human-machine interface (HMI), a computer display of the substation's single-line diagram (SLD). The bay control unit, on the control and relay panel of the bay, operates the devices of its own bay. At the apparatus level, the device is operated at its own mechanism in the yard (POWERGRID automation specification §2.2, §2.3).

Only one operator controls a device at a time. Control priorities prevent the operation of one switch from 2 levels at once, and the priority lies with the lowest level enabled for control (POWERGRID automation specification §2.2, §2.3). An operator at the bay therefore takes control from the control room, and an operator in the control room takes it from the remote centre. In the remote mode, control passes to the remote centre or the station HMI, and the lower levels cannot operate (POWERGRID automation specification §3.1.1.2).

Figure 1.The control levels of a substation. Commands pass down to the switchgear and indications of position and alarms pass up, and control rests with the lowest level enabled for it. The drawing is schematic and not to scale.

A command is given in 2 stages for security. The operator first selects the device and then gives the command, and the device operates only when both are present. This is the select-before-execute procedure (POWERGRID automation specification §2.3.1). After the selection, the operator sees the selected device on the screen, and the other switchgear is blocked. The command executes only if the device is not blocked and no interlocking condition is violated (Interlocking between the devices of a bay, Electrical, mechanical and key interlocks; POWERGRID automation specification §3.2.4.4).

The bay control unit holds the interlocks of its bay, so that the bay can be operated from it when the station HMI is out of service (Interlocking between the devices of a bay, Electrical, mechanical and key interlocks). A breaker can also be opened or closed with push buttons when the bay control unit has failed, and the interlocks are bypassed in that emergency mode (POWERGRID automation specification §3.1.1.2).

2Indications and alarms

Control needs a true picture of the plant. The position of each breaker, isolator (disconnector, IEC 60050) and earth switch is supervised continuously. A change of position appears at once on the SLD of the station HMI and in the event list. A position is signalled by 2 auxiliary contacts, one normally open and one normally closed. An alarm is raised if the 2 disagree, or if a mechanism takes longer than its set time to change position (POWERGRID automation specification §3.2.1).

Events and alarms are listed with their time to a resolution of 1 ms (POWERGRID automation specification §3.2.3). The voltage, current, active power and reactive power of the bays are measured from the instrument transformers and shown on the station HMI and at the control centre (POWERGRID automation specification §3.1.2.2, §3.2.2). The data a substation sends to the grid's control centres are the subject of SCADA and substation automation (IEC 61850), SCADA and the remote terminal unit. RUS Bulletin 1724E-300 §16.3.7 notes that most stations are unattended, and the remote control centre then operates them from these indications and measurements.

3Control and relay panels

Most of the relaying, metering and control equipment of a substation is mounted on control and relay panels in the control house (RUS 1724E-300 §16.3.1). A distribution circuit can have its relays, meters and controls on a single panel. Circuits of higher voltage commonly use duplex panels in 2 parallel rows, back to back. The operating, measuring and control equipment of a circuit is on the front of one panel, and its relays are on the front of the panel directly behind it.

The panels are arranged to follow, as closely as possible, the arrangement of the equipment and circuits in the yard. A mimic bus on the panels shows the bus and circuit arrangement, and it may be drawn on a computer screen instead. Meters are placed at eye level and operating switches at a convenient height near the centre of the panel. Relays are placed from the top of the relay panel downward, and space is left to install, remove and test them (RUS 1724E-300 §16.3.1).

The panels are wired at their backs, and their devices connect to terminal blocks. The cables from the yard end on these terminal blocks, or on terminal cabinets placed between the yard and the panels. The panels stand so that their backs are accessible (RUS 1724E-300 §16.3.1). A three-phase microprocessor relay replaces 3 single-phase electromechanical relays and their meters in one case, so the panels and the control house have become smaller. Much of the newer equipment fits 19-inch racks (RUS 1724E-300 §16.3.1).

A utility's specification for a substation with an automation system places the bay control unit in the relay panel of its breaker. It houses the bay control units, the relay and protection panels and the communication panels in air-conditioned panel rooms in the switchyard, and the station HMI in the control room building (POWERGRID automation specification §2.1, §4.2.2). The specification places them there to optimise the cabling and the size of the control room building.

4Control cables and the yard

The control cables run from the equipment in the yard to the panels. In the control house, a cable trench runs beside the backs of the control and relay panels, and with duplex panels the whole space between the rows can serve as the trench. A false floor is used where large areas need cable routes. Duplicate circuits are routed apart, so that damage in one area leaves the other circuit in service (RUS 1724E-300 §16.3.4.1, §16.3.4.2). The cables enter the building through wall openings, sleeves or cable pits, with spare openings for future cables (RUS 1724E-300 §16.3.5).

5The control room and its building

A larger substation needs a building for its relays, meters, controls, batteries, communication equipment and low-voltage distribution, which a small distribution substation can fit in weatherproof cabinets (RUS 1724E-300 §16.1). The control house gives this equipment a weatherproof enclosure, with environmental control where required. It can also hold medium-voltage (MV) switchgear, a workshop, storage and toilets.

The building's layout serves the equipment and the people who work on it:

  • Battery. The battery is placed in a separate room where practical. Its room is ventilated to keep the hydrogen below an explosive mixture, a powered ventilation system has an alarm on failure, and water or a neutralising agent is provided to rinse eyes and skin. The charger, the DC distribution panel and their monitoring stand in the control and relay room (RUS 1724E-300 §16.2.3, §16.3.2).
  • Heating, ventilation and air conditioning. These systems keep the electrical equipment within its operating range and its accuracy. In an unattended substation, the control maintains the level the equipment needs, and raises the temperature to a comfort level during maintenance (RUS 1724E-300 §16.3.7).
  • Lighting. The lights are placed to avoid reflection and glare on meters, relays and screens. An emergency lighting system fed from DC is recommended for use when the alternating current (AC) supply fails (RUS 1724E-300 §16.3.6).
  • Exits and fire. The building has at least one double door for moving equipment in and out. A second exit is provided where an accident could close or block a single exit, and fire extinguishers are placed and marked (RUS 1724E-300 §16.2.3).

6The DC supply of control

The control circuits must work during the fault that the protection clears, and after a loss of the AC auxiliary supply. They are therefore fed from the station battery, whose sizing and chargers DC system explains. The DC system supplies the relaying, supervisory, alarm and control equipment, the emergency lighting of the control house and the trip and close circuits of the breakers (RUS 1724E-300 §15.2.1). The charger supplies the steady loads in normal service. A short load such as a breaker trip is supplied by the charger within its capacity and the excess by the battery, and the battery carries the whole load when the charger's AC supply fails (RUS 1724E-300 §15.2.2).

The interlocking coils of the isolators and earth switches are also fed from the station DC supply, so that the interlocks hold during a loss of AC (Interlocking between the devices of a bay, Electrical, mechanical and key interlocks; POWERGRID isolator specification §2.0(c)).

7In the design

The design places the control building in the yard layout and sizes its rooms (Roads, trenches and buildings, Control building). In the default project, the building is 12 m deep. The control and relay room is 15 m long, and the battery and charger room 6 m long, beside it. The station service loads include the air conditioning of the control, relay and battery rooms, 15.1 kW, and 6 bay marshalling kiosks, whose heaters and lighting take 0.3 kW each (AC auxiliary supply, The load list).

The auxiliary sheet draws the 220 V DC distribution board (DCDB) of the IEC + CEA / CBIP set. One of its feeders supplies the equipment of supervisory control and data acquisition (SCADA), the remote terminal unit (RTU) and the substation automation system (SAS) (SCADA and substation automation (IEC 61850)). Its 6 outgoing feeders are:

  • 220 kV relay and control panels
  • 220 kV CB control supply, the trip and close circuits of the HV circuit breakers
  • 33 kV switchgear
  • SCADA, RTU and SAS equipment
  • Emergency lighting
  • Spare

The DC system's continuous load is 150 W per HV bay and 500 W common to the substation (DC system, The duty cycle).

The ANSI / IEEE set feeds its control circuits at 125 V. Its compliance checklist checks the station battery against the DC control voltage range of the breakers (IEEE C37.04-2018 Table 23). For a 230 kV project, the check finds 60 cells: 105.0 V at the end of discharge to 139.8 V on equalize, within 100 V to 140 V, and its status is Complies.

The design does not lay out the control and relay panels, draw the control schematics or schedule the control cables.

Review questions
  1. Explain which control level has control when 2 levels are enabled.
    Answer 1

    The priority lies with the lowest level enabled for control, so an operator at the bay takes control from the control room (Control positions and their priority).

  2. Describe the select-before-execute procedure.
    Answer 2

    The operator first selects the device and then gives the command, and the device operates only when both are present and no interlocking condition is violated (Control positions and their priority).

  3. State how the position of a breaker is signalled to the control room.
    Answer 3

    By 2 auxiliary contacts, one normally open and one normally closed, with an alarm when the 2 disagree (Indications and alarms).

  4. Describe the arrangement of duplex control and relay panels.
    Answer 4

    The panels stand in 2 parallel rows back to back, with a circuit's operating and control equipment on the front of one panel and its relays on the front of the panel behind it (Control and relay panels).

  5. Explain why the control and trip circuits are fed from the battery.
    Answer 5

    They must work during a fault and after a loss of the AC supply, and the battery carries the whole DC load when the charger's AC supply fails (The DC supply of control).

  6. Name the outgoing feeders of the default project's DC distribution board.
    Answer 6

    220 kV relay and control panels, 220 kV CB control supply, 33 kV switchgear, SCADA, RTU and SAS equipment, Emergency lighting and Spare (In the design).

Sources

[1]RUS Bulletin 1724E-300, Design Guide for Rural Substations.

[2]POWERGRID automation specification, Technical Specification, Section: Sub-station Automation System.

[3]POWERGRID isolator specification, Model Technical Specification, Section: Switchgear, Isolator.

[4]IEEE C37.04-2018, IEEE Standard for Ratings and Requirements for AC High-Voltage Circuit Breakers.

[5]IEC 60050-441, International Electrotechnical Vocabulary, Part 441: Switchgear, controlgear and fuses.

Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.