Lightning, switching and temporary overvoltages

The insulation of a substation is rated for its operating voltage, but the voltage does not stay at that value. Faults, switching and lightning raise it for times from microseconds to hours. A voltage above the highest operating voltage is an overvoltage. This topic explains where overvoltages come from, how large they are and how long they last. It then explains how a substation withstands them with its insulation, its surge arresters and its shielding.

Before this topic: Faults and fault current

1Overvoltages and their classes

An overvoltage is a voltage above the network's highest operating voltage, superimposed on it. It can appear between a conductor and earth or between 2 phases. Its size is stated in per unit. A value in per unit is a quantity divided by a base value of the same kind, so it carries no unit (Per-unit quantities). The base of a phase-to-earth overvoltage is the peak phase-to-earth voltage of the highest voltage for equipment , that is (IS 2165 (Part 1):1977 §2.15). Overvoltages differ in their magnitude, their duration and the speed at which they rise. The withstand of an insulation depends on these.

IEC 60071-1:2019 classifies voltage stresses by their shape and duration (Table 1). Above the continuous power-frequency voltage, it names the temporary, the slow-front, the fast-front and the very-fast-front overvoltages. A temporary overvoltage is at or near the power frequency and of relatively long duration. A slow-front overvoltage is typically caused by switching. A fast-front overvoltage is typically caused by lightning. A very-fast-front overvoltage arises in gas-insulated switchgear (GIS) when an isolator (disconnector, IEC 60050) operates: its contacts strike and restrike several times, and each collapse of the voltage sends a surge along the busbar duct.

As a guide to their size, a temporary overvoltage from an insulation fault reaches up to per unit and lasts over 1 s. A switching overvoltage typically reaches 2 to 4 per unit and lasts in the order of 1 ms. A lightning overvoltage exceeds 4 per unit, with a front of 1 µs to 10 µs. These values are indicative for medium-voltage (MV) and high-voltage (HV) networks. The values at a given substation come from its own insulation coordination study.

2Temporary overvoltages

A temporary overvoltage (TOV) is an oscillatory overvoltage at or near the power frequency. It lasts from a few cycles to hours. The most common cause is an earth fault, and other causes are load rejection, the energising of unloaded lines and ferroresonance.

Earth faults. A line-to-earth fault pulls the faulted phase towards earth potential (Faults and fault current, Fault types). The voltages of the 2 sound phases rise. How far they rise depends on how the neutral is earthed. The earth fault factor measures it. It is the ratio of the highest phase-to-earth voltage on a sound phase during the fault to the phase-to-earth voltage at the same place without the fault. With the network's resistances neglected, it follows from 2 reactances of the network seen from the fault. The positive-sequence reactance is the reactance that a balanced three-phase current meets. The zero-sequence reactance is the reactance that 3 equal currents in phase meet, flowing out on the 3 phases and returning through earth (Symmetrical components, Balanced sequence systems):

(1)
Cahier Technique 151 §1
where
earth fault factor
ratio of the zero-sequence to the positive-sequence reactance at the fault
zero-sequence reactance of the network seen from the faultΩ
positive-sequence reactance of the network seen from the faultΩ

With equal to , is 1. In an unearthed network tends to infinity, and approaches . The sound phases then rise to the phase-to-phase voltage. The earth fault factor does not exceed 1.4 when is less than 3 times and the zero-sequence resistance is less than (IS 2165 (Part 1):1977 §2.13). A network whose earth fault factor is 1.4 or less is called effectively earthed. The Central Electricity Authority (CEA) Connectivity Regulations 2007 (Schedule, Part III 7) state that this factor "shall be not more than 1.4" for an effectively earthed system. The overvoltage lasts until the protection clears the fault.

Load rejection. The sudden disconnection of a large load, called load rejection, also raises the network's voltage for a time. The CEA Grid Standards Regulations 2010 limit the temporary overvoltage due to sudden load rejection (Reg. 3(1)(c), Table 2). The limit is 283 kVp phase-to-neutral at 220 kV and 514 kVp at 400 kV.

Long unloaded lines. A long line energised at one end and open at the other has a higher voltage at the open end than at the source. This is the Ferranti effect, caused by the line's capacitance and inductance. On a lossless line at 50 Hz, the voltage at the open end is 1.05 times the source voltage for a length of 300 km, and 1.15 times for 500 km.

Ferroresonance. A capacitance in series with an iron-cored inductance, such as a transformer winding, can settle at a state of high voltage. The circuit is pushed into that state by a transient, often a switching operation whose poles do not close or open together. The overvoltage can break down insulation and damage equipment connected across the capacitance. A load on the circuit damps it.

3Switching overvoltages

A switching operation changes the network's structure in a moment. The energy stored in its inductances and capacitances then oscillates, and the voltage overshoots. Switching overvoltages typically reach 2 to 4 per unit and last in the order of 1 ms.

The energising of an unloaded line or cable is one source. The closing breaker applies a voltage step to one end, and the step travels to the open end, where it is reflected. The incident and the reflected step add, and the voltage there approaches twice the applied step. The energising of a capacitor bank gives an overvoltage of up to twice the peak voltage. A bank switched again before it has discharged can give up to 3 times. The breaking of small inductive currents can also cause high overvoltages, when the breaker cuts the current before its natural zero.

Switching overvoltages matter most at the highest voltages. There, the margin between the operating voltage and the insulation's withstand is smallest. The insulation is tested against them with a standard switching impulse of 250 µs to its peak and 2500 µs to half its value.

4Lightning overvoltages

A lightning stroke injects a current of several tens of kiloamperes into whatever it strikes. Most strokes carry a negative charge to earth. The current rises to its peak within microseconds, and the voltage it creates rises as fast.

A direct stroke to a phase conductor. The current divides and travels in both directions along the line. Each half meets the line's surge impedance, so the voltage of the conductor rises to

(2)
Cahier Technique 151 §1
where
voltage of the struck conductorV
surge impedance of the line, 300 Ω to 1000 ΩΩ
current of the lightning strokeA

With a current of tens of kiloamperes, reaches millions of volts, which no line insulation withstands. The first insulator string the surge meets flashes over, and the stroke becomes an earth fault.

A stroke to a tower or a shield wire. The current flows to earth through the tower and its footing. The tower's potential rises with the footing resistance and the rate of rise of the current. If it rises far enough, the insulator flashes over from the tower to a phase conductor. This is a back flashover. A low footing resistance makes it less likely.

Travelling waves. A surge on a line travels towards the substation as a wave. At a point where the impedance changes, such as an open breaker or a transformer, the wave is partly reflected, and the voltage there can approach twice that of the incoming wave. The surge arrives first at the equipment at the line's entry. Figure 1 shows the path of a surge into a substation and the devices that limit it. The insulation is tested against lightning surges with a standard lightning impulse of 1.2 µs to its peak and 50 µs to half its value.

Figure 1.A lightning surge travels along the line into the substation, where the surge arresters at the line entry and at the transformer limit it. The shield wires and masts intercept direct strokes on the yard. The drawing is schematic and not to scale.

5How a substation withstands overvoltages

Insulation coordination sets the insulation of the equipment against the overvoltages it can meet. It weighs the cost of insulation and of protective devices against the cost of failures. A substation combines the following means.

Insulation levels. The equipment of a voltage level is rated for a lightning impulse withstand voltage, the basic lightning impulse insulation level (BIL). At the highest voltage levels it also has a switching impulse withstand voltage (Insulation levels, The ratings of a level).

Surge arresters. A surge arrester is connected between a phase and earth. A metal-oxide (zinc oxide) arrester has a highly non-linear resistance. At the operating voltage it passes a small leakage current, and under a surge its resistance falls by several orders of magnitude. It therefore limits a surge at its terminals to its protective level, which lies below the equipment's withstand. An arrester must also withstand the temporary overvoltages at its location. Its rated voltage is chosen from the TOV at its location and the TOV's duration (Insulation levels, The surge arrester rating).

Shielding. Shield wires and lightning masts over the yard intercept direct strokes, so that a stroke reaches earth through them and not through a phase conductor (Direct stroke shielding by the rolling sphere, Masts and shield wires).

Earthing of the neutral. A solidly earthed HV neutral keeps the earth fault factor low, and with it the temporary overvoltages on the sound phases (Earthing of the neutral, The HV system: solid earthing).

6In the design

The design takes the insulation level of each voltage level from its level table and does not calculate the overvoltages. At the default 220 kV level, the equipment is rated 245 kV and 1050 kVp. The surge arresters are rated 216 kV, at the entry of each line bay and at the HV terminals of each transformer (Bays and their equipment). The checklist item for the arrester rating has the status Needs your review, and it is answered from the neutral earthing study.

The design solidly earths the HV neutrals of the interconnecting transformers. From the study's sequence reactances at the default HV bus, = 6.302 Ω and = 7.942 Ω, so = 1.260. By Eq. (1), the earth fault factor is 1.04, below the 1.4 of an effectively earthed system. A line-to-earth fault there raises the sound phases from 127 kV to 132 kV.

The design's lightning protection places 17 masts of 25.0 m and 5 shield wires at 18.5 m over the default yard (Direct stroke shielding by the rolling sphere, The rolling sphere over the yard). The checklist of a GIS yard leaves the very-fast-front overvoltages in the GIS to its supplier. SubstationLayout performs no insulation coordination study, and calculates no switching or lightning surges.

Review questions
  1. Name the classes of overvoltage and a cause of each.
    Answer 1

    Temporary overvoltages come from earth faults, load rejection and ferroresonance, slow-front overvoltages from switching, fast-front overvoltages from lightning, and very-fast-front overvoltages from isolator operations in a GIS (Overvoltages and their classes, Temporary overvoltages).

  2. Calculate the earth fault factor of a network whose zero-sequence reactance equals its positive-sequence reactance.
    Answer 2

    With = 1, Eq. (1) gives = 1, so the sound phases keep their normal voltage (Temporary overvoltages).

  3. Explain why a direct stroke to a phase conductor causes a flashover.
    Answer 3

    The stroke's current divides along the line and meets its surge impedance, so reaches millions of volts and the first insulator string flashes over (Lightning overvoltages, Eq. (2)).

  4. Describe what happens to a travelling wave at an open breaker or a transformer.
    Answer 4

    The wave is partly reflected where the impedance changes, and the voltage there can approach twice that of the incoming wave (Lightning overvoltages).

  5. Explain how a surge arrester protects equipment, and what sets its rated voltage.
    Answer 5

    Its resistance falls by several orders of magnitude under a surge, so it limits the surge to its protective level, and its rated voltage is chosen from the temporary overvoltage at its location and its duration (How a substation withstands overvoltages).

  6. Find the earth fault factor at the default project's HV bus.
    Answer 6

    With = 1.260, the factor is 1.04, below the 1.4 of an effectively earthed system (In the design).

Sources

[1]Cahier Technique 151, Cahier Technique no. 151: Overvoltages and insulation coordination in MV and HV. §1.

[2]IS 2165 (Part 1):1977, IS 2165 (Part 1): 1977, Insulation coordination, Part 1: Phase to earth insulation coordination principles and rules.

[3]ABB High Voltage Surge Arresters Buyer's Guide, High Voltage Surge Arresters Buyer's Guide.

[4]Solectria white paper on effective grounding, Effective Grounding for PV Plants.

[5]Burow and others 2012, New mitigation methods for transient overvoltages in gas insulated substations.

[6]CEA Grid Standards Regulations 2010, Central Electricity Authority (Grid Standards) Regulations, 2010.

[7]CEA Connectivity Regulations 2007, Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007.

[8]IEC 60071-1:2019, Insulation co-ordination.

[9]IEC 60050-441, International Electrotechnical Vocabulary, Part 441: Switchgear, controlgear and fuses.

Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.

CitationSubstationLayout Reference, Lightning, switching and temporary overvoltages, revision 3, 9 Nov 2026, https://substation.solarlayout.app/library/reference/overvoltages