Interlocking between the devices of a bay

A bay of a high-voltage (HV) switchyard has a circuit breaker, isolators (disconnectors, IEC 60050) and earth switches, and each device has a duty it must not exceed. An operator who opens an isolator under load, or closes an earth switch onto a live line, can injure people and damage the plant. Interlocks prevent these operations. This topic explains why the devices of a bay must operate in a fixed order, how electrical, mechanical and key interlocks hold that order, and how a bus coupler and an on-load bus transfer are interlocked. It closes with the tags that the design's key diagram gives the devices of a bay.

Before this topic: Bays and their equipment · Bus schemes

1What an interlock does

Interlocking makes the operation of a switching device depend on the position or the operation of other equipment (Energy Queensland STNW3046 §1.2). Its purpose is to prevent an incorrect operation that could harm the operator or damage the plant. A switching sheet or an operating procedure is an administrative control, because it relies on the operator following it. An interlock is an engineering control, which ranks higher in the hierarchy of controls (STNW3046 §4).

A transmission utility's specification states the aim in one requirement. The substation has a full interlocking scheme, so that its isolators, fixed earth switches and, where required, circuit breakers operate in the correct sequence (National Grid TS 3.01.01 §1.1.1). The same specification lists the conditions the scheme covers (TS 3.01.01 §1.1.3):

  • between breakers and isolators, so that an isolator does not make or break load current
  • between isolators and earth switches, so that an earth switch cannot close onto a locally energised circuit, and cannot be energised by an isolator while it is closed
  • the sequence of an on-load busbar transfer in a substation with more than one bus
  • a bus coupler or bus-section breaker, which closes only when its associated isolators are both open or both closed

The interlocks work in both directions of a sequence. If an earth switch must close before an access gate opens, the gate must be locked shut before the earth switch can open (TS 3.01.01 §1.1.9).

2Why an isolator does not operate on load

An isolator (disconnector, IEC 60050) opens or closes a circuit only when the current is negligible, or when the voltage across its poles does not change significantly (Isolators and earth switches, The duty of an isolator). A utility's isolator specification states the same duty: the isolator makes and breaks normal currents only when no significant change in voltage occurs across the terminals of each pole (POWERGRID isolator specification §2.0(e)). An isolator has no means to interrupt an arc. Opened under load, it draws an arc across its contacts that it cannot extinguish.

The breaker of the bay therefore opens first, and the isolators then open with no current through them. The interlock between the breaker and its isolators holds this order. It blocks an isolator while the breaker is closed. It does not trip the breaker when the operator attempts to operate the isolator, because tripping by an attempted isolation is itself an incorrect operation (STNW3046 §5.1.1).

An earth switch connects an isolated circuit to the earth mat, so that people can work on it (Isolators and earth switches, Earth switches). Closed onto a live circuit, it makes a fault to earth. An earth switch is also required to discharge the trapped charge of the line it earths (POWERGRID isolator specification §2.0(d)).

3The operating sequence of a bay

The duties of the devices fix the order in which they operate. Figure 1 shows a line bay on a double main bus and the condition that releases each device. To take the line out of service and earth it, the operator works through 3 steps:

  1. Open the circuit breaker, which interrupts the load current.
  2. Open the line isolator and the bus isolator that is closed. Both now open with no current.
  3. Prove the line dead, and close the line earth switch.

To return the line to service, the order is reversed. The earth switch opens first, the isolators close next with no current to make, and the breaker closes last. The breaker is the only device of the bay that makes the load current.

Figure 1.The interlock conditions of a line bay on a double main bus. Each numbered device operates only under the condition listed beside it, which holds the order of operations shown at the foot of the panel. The drawing is schematic and not to scale.

The conditions of Figure 1 form a chain. The breaker blocks the isolators, the line isolator blocks its earth switch, and the earth switch blocks the line isolator in turn. The breaker does not close while the earth switch of its bay or a bus earth switch is closed (STNW3046 §5.1.2). Isolators and earth switches can also be padlocked in the open or the closed position, so that a device stays where the work requires it (STNW3046 §5.1.1).

4The earth switch and the line voltage

The interlock between a line isolator and its earth switch takes its condition from the local isolator only. The line itself can still be live from its remote end. The local interlock therefore cannot show alone that the line is dead, and a second condition is added. The circuit must be proved de-energised before its earth switch can close (STNW3046 §5.2.1). Energy Queensland fits voltage detecting systems to its circuits except in outdoor air-insulated switchgear (STNW3046 §5.6). There, the check can use the line's voltage transformer, read by a bay control unit that releases the earth switch only when no voltage is present (STNW3046 §5.8.1).

A line protected over a communication link between its 2 substations can also carry the remote end's state into the interlock. Each end then sends an isolated and an earthed signal. The remote isolated signal is required before the local earth switch can close. The remote earthed signal blocks the removal of the local isolation (STNW3046 §5.2.3). Where the interlocking cannot practically reach the remote end, partial interlocking of a line earth switch is accepted, and the switch carries a label stating that it is not fully interlocked (TS 3.01.01 §1.1.8).

A bus earth switch earths a whole bus, so its interlock reaches across the bays of the substation. The bus earth switch cannot close until the sources that can feed the bus, the outgoing circuits included, are open and isolated, and the bus is proved dead. While it is closed, no point of isolation from the bus can be changed (STNW3046 §5.2.2). A utility's automation specification keeps this interlock hardwired, in addition to its software interlocking (POWERGRID automation specification §2.3.2).

5Bus coupler and bus transfer interlocks

In a double main bus scheme, each circuit connects to Bus-1 or Bus-2 through its own pair of bus isolators, and a bus coupler joins the 2 buses (Bus schemes, Bus schemes of the IEC + CEA / CBIP set). The coupler has a breaker between 2 isolators. Its breaker closes only when its 2 isolators are both open or both closed (TS 3.01.01 §1.1.3(e)).

An on-load bus transfer moves a circuit from one bus to the other without an interruption. With the coupler closed, the 2 buses are at the same voltage. Closing the circuit's second bus isolator then causes no significant change in voltage across its poles, which is within the duty of an isolator (Why an isolator does not operate on load). The circuit runs for a moment on both buses, and its first bus isolator then opens with the current passing through the other path. The transfer is interlocked to follow this sequence (TS 3.01.01 §1.1.3(d)). The second bus isolator of a circuit is released only while the coupler and its isolators are closed.

A transfer bus scheme has a similar interlock for the transfer bus. The utility's automation specification also keeps that interlock hardwired (POWERGRID automation specification §2.3.2).

The same principle governs a transfer between 2 sources of the auxiliary supply. The transfer switch operates break-before-make, so that the 2 sources are not shorted together, and a mechanical interlock lets the switch take only one of its 2 positions (RUS Bulletin 1724E-300 §15.1.2.6).

6Electrical, mechanical and key interlocks

An interlock is built in one of 3 ways. Switching sequences of power-operated devices are interlocked electrically. The interlock status is confirmed automatically when an operation starts, from any control position (TS 3.01.01 §1.1.4). Sequences that include a manually operated device may be interlocked electrically or mechanically, and the status is confirmed immediately before the operation (TS 3.01.01 §1.1.5).

  • Mechanical interlocks. An earth switch built onto an isolator is interlocked with it in its construction. The earth switch then operates only when the isolator is open, and the isolator only when the earth switch is open (POWERGRID isolator specification §2.0(b); RUS 1724E-300 §4.4.7). In an outdoor air-insulated yard, isolators and earth switches are mechanically interlocked, and their positions are used by the interlocks of other devices (STNW3046 §5.4.5). Metal-clad switchgear also has mechanical interlocks (Circuit breakers, Metal-clad switchgear with withdrawable breakers). A bay of gas-insulated switchgear (GIS) normally has an electromechanical or solid-state interlocking control board of its own (Siemens High-Voltage Products, Gas-Insulated Switchgear).
  • Electrical interlocks. An isolator and an earth switch carry an interlocking coil, which prevents both their electrical and their manual operation until the interlocking conditions are met. The coil is fed from the station's direct current (DC) supply, and the interlock is fail-safe (POWERGRID isolator specification §2.0(c)). The conditions are formed by the auxiliary contacts of the other devices, wired between the bays or exchanged as messages between bay control units (SCADA and substation automation (IEC 61850), IEC 61850).
  • Key interlocks. A key interlock is a mechanical interlock between devices that are not linked: the key held in one device's lock is needed to operate another device or to open an enclosure. The keys of a site have no master key, and no key profile repeats on the same site. Each key is engraved with a reference unique to the site, which, where appropriate, names the switching device where the key sits in normal operation. Key exchange boxes stand where the operating sequences need them (TS 3.01.01 §1.2.2 to §1.2.5). A shunt capacitor bank is a typical application: its keys prevent entry into the bank until it has been de-energised for at least 5 min and its earthing and shorting switches are closed (RUS 1724E-300 §5.6.12.2).

A key must be carried to the device by a person. Devices operated from a remote control position can therefore bypass a key scheme, and a utility now uses key interlocks to control access to the plant, not the operation of remotely controlled switchgear (STNW3046 §6.3).

Interlocks also act at 2 levels. A bay-level interlock joins the devices of one bay, such as its breaker, isolators and earth switch. A station-level interlock acts between bays: it sends a block or a release to the interlocks of the bays, for example a release to close the breakers of a bus while its bus earth switch is open (STNW3046 §4.1). In a substation automation system, the bay control unit holds the interlocks of its bay. The bay can then be operated from its bay control unit, with its interlocks in force, when the station's operator station is out of service (POWERGRID automation specification §4.2.2).

An interlock is designed to fail safely when its DC supply, a bay control unit or a communication link fails (STNW3046 §4.3). An override for a repair, or for an abnormal network arrangement during the installation of temporary plant, is lockable, and it is used under the switching procedure (TS 3.01.01 §1.1.6, §1.1.7; STNW3046 §5.8).

7In the design

The design draws the devices that the interlocks join and gives each one a tag. It draws the single-line diagram (SLD) and the electrical key diagram, which repeats the SLD with each bay numbered and each HV device tagged by its bay. An interlocking scheme names its devices by these tags, and a utility records the interlocks of a bay on its operating single-line diagram with an interlock table (STNW3046 §7).

The default project is a 220 kV double main bus. On the key diagram in the POWERGRID format, its line bay is bay 201. The breaker is 201 52, the bus isolators are 89A and 89B, and the line isolator with its earth switch is 201 89L, 89LE. The bus coupler is bay 203, with its breaker 203 52. In the IEC 81346 format, the same breaker is =E01−Q0, the bus isolators are −Q1 and −Q2, and the line isolator is =E01−Q9 with its earth switch −Q8.

The ANSI / IEEE set prints the device function numbers of IEEE C37.2-1996 before the bay number. In a 230 kV project with a one-and-a-half breaker scheme, the main breaker of the line on Bus-1 is 52-101, and the line's disconnect switch with the grounding switch is 89L-101, 57L-101. Device 57 of IEEE C37.2-1996 is the short-circuiting or grounding device (Isolators and earth switches, In the design).

The auxiliary sheet states the interlock of the switchboard of the alternating current (AC) auxiliary supply, the AC distribution board (ACDB), which joins its 2 auxiliary transformers and the diesel generator set (DG). The sheet of the default project (AC auxiliary supply, Sources and switchboard) prints the note Interlock: at most 2 of the 3 incomers are closed. The DG feeds Section-1 through the coupler. At 33 kV, the SLD draws the medium-voltage (MV) bus in 2 sections, with the bus-section breaker normally open (Circuit breakers, MV switchgear).

The design sets no interlocking scheme of the HV bays: it specifies no interlock logic, interlocking coils or key system.

Review questions
  1. Explain why the breaker of a bay opens before its isolators.
    Answer 1

    An isolator makes or breaks only a negligible current, so the breaker interrupts the load current first and the isolators then open with no current through them (Why an isolator does not operate on load).

  2. State the 3 steps that take a line out of service and earth it.
    Answer 2

    Open the circuit breaker, open the line isolator and the closed bus isolator, then prove the line dead and close the line earth switch (The operating sequence of a bay).

  3. Explain why the interlock of a line earth switch includes a check of the line voltage.
    Answer 3

    The interlock with the local isolator cannot show that the line is dead, since the line can be live from its remote end, so the circuit is proved de-energised before the earth switch closes (The earth switch and the line voltage).

  4. Describe the interlock of an on-load bus transfer.
    Answer 4

    The second bus isolator of the circuit is released only while the bus coupler and its isolators are closed, so the 2 buses are at the same voltage when it closes, and the first bus isolator opens after it (Bus coupler and bus transfer interlocks).

  5. Distinguish a key interlock from an electrical interlock.
    Answer 5

    A key interlock passes a key held in one device's lock to operate another device or open an enclosure, while an electrical interlock blocks a device through an interlocking coil fed from the DC supply (Electrical, mechanical and key interlocks).

  6. Name the tags of the default project's line bay on the key diagram.
    Answer 6

    In the POWERGRID format, the breaker is 201 52, the bus isolators are 89A and 89B, and the line isolator with its earth switch is 201 89L, 89LE (In the design).

Sources

[1]National Grid TS 3.01.01, Technical Specification TS 3.01.01 (RES): Substation Interlocking Schemes.

[2]Energy Queensland STNW3046, Substation Standard STNW3046: Standard for Interlocking.

[3]POWERGRID isolator specification, Model Technical Specification, Section: Switchgear, Isolator.

[4]POWERGRID automation specification, Technical Specification, Section: Sub-station Automation System.

[5]RUS Bulletin 1724E-300, Design Guide for Rural Substations.

[6]IEC 60050-441, International Electrotechnical Vocabulary, Part 441: Switchgear, controlgear and fuses.

[7]IEEE C37.2-1996, Standard Electrical Power System Device Function Numbers.

[8]IEC 81346-2:2019, Classification of objects and codes for classes.

[9]Siemens High-Voltage Products, High-Voltage Products.

Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.

CitationSubstationLayout Reference, Interlocking between the devices of a bay, revision 2, 9 Nov 2026, https://substation.solarlayout.app/library/reference/interlocking