Tariff and revenue metering

Energy that passes between a generating plant and the grid is bought and sold, so it is measured at the point of interconnection by meters built and placed for billing. This topic explains the interface meters that the CEA metering regulations require: the main, check and standby meters, their accuracy classes and the instrument transformer cores that feed them. It then explains the availability-based tariff (ABT) and the time blocks in which the meters record energy. A section on the revenue metering of the ANSI / IEEE set follows. The topic closes with the meters that the design places on the single-line diagram (SLD).

Before this topic: Current transformers · Voltage transformers and CVTs · Bays and their equipment

1Metering for accounting and billing

The Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 govern the meters of generating companies, licensees and consumers (CEA Meters Regulations, Reg. 3(1)). They name 3 kinds of meter by purpose: the interface meter, the consumer meter, and the energy accounting and audit meter (Reg. 3(3)). An interface meter is used for accounting and billing at the point of interconnection between the systems of generating companies, licensees and open-access consumers (Reg. 2(1)(n)). A meter, in the regulations' sense, includes the instrument transformers needed for the measurement (Reg. 2(1)(p)).

The regulations were amended in 2010, 2014, 2019, 2022 and 2026. The 2019 amendment rewrote the definitions, the locations of the interface meters and their technical standards. New interface meters are static meters with automatic remote meter reading (Reg. 4(1)(a)). They follow the standards of the Bureau of Indian Standards, or an IEC standard where no Indian Standard exists (Reg. 5(a)). The interface meters are therefore a statutory part of a plant's grid connection. The substation provides their place in the bays and the instrument transformer cores that feed them.

2Main, check and standby meters

An interface has 3 meters, so that a billing value exists when one meter fails. The main meter is the meter used primarily for accounting and billing (Reg. 2(1)(o)). The check meter is connected to the same core of the instrument transformer as the main meter, and it is used for billing when the main meter fails (Reg. 2(1)(i)). The standby meter is connected to an instrument transformer other than that of the main and check meters. It is used when both the main and the check meter fail (Reg. 2(1)(v)).

Table 1 of the regulations sets where the meters go (Reg. 7(1)). At a generating station, the main and check meters sit on the outgoing feeders. The standby meters sit on the high-voltage (HV) side of the generator transformers and of the station auxiliary transformers. On a line between the substations of 2 licensees, each end has a main meter, and the meter at the far end serves as the standby meter. At an interconnecting transformer (ICT) of the grid, the main meter sits on the HV side and the standby meter on the low-voltage (LV) side.

Figure 1 shows that arrangement at a plant's grid connection. Notice that the main and check meters share one metering core of the line's current transformer (CT) and one metering winding of its capacitor voltage transformer (CVT). The standby meter takes its current from a separate CT, on the HV side of the transformer.

Figure 1.The interface meters at a plant's grid connection, as the CEA metering regulations place them at a generating station. The main and check meters share the metering core of the line's CT, and the standby meter sits on the HV side of the transformer. The drawing is schematic and not to scale.

The main and check meters measure the same current and voltage, so their readings agree within their accuracy. When their readings for a month differ by more than 0.5 %, the instrument transformer connections are checked. The interface meter is then tested at site against a reference standard meter of a higher accuracy class (Reg. 15(1)(a)). The load despatch centre analyses and validates the readings of the main, check and standby meters for each time slot (Reg. 15(1)(d)). The meters are installed as near as possible to the instrument transformers, to reduce the voltage drop in the secondary leads (Reg. 9(6)).

Both parties to an interface seal its meters: the supplier and the buyer (Reg. 12(1)(a)). The seals of an interface meter are removed only after notice to the other party, who witnesses the removal and the resealing (Reg. 12(2)(a)). The party that breaks and reseals the seals records the date, the serial numbers of the seals and the reason in the meter register.

3Accuracy classes

An accuracy class states the limits of a meter's error over its range of current and power factor. The Schedule of the regulations sets the class by the meter's purpose (CEA Meters Regulations, Schedule Part I(2), item 3). The interface meter has the highest class of the Schedule:

MeterAccuracy class
Interface meter0.2S
Consumer meter above 33 kV0.2S
Consumer meter above 650 V and up to 33 kV0.5S
Energy accounting and audit meter of the transmission system0.2S or better

The classes 0.2S and 0.5S are classes of IEC 62053-22. That standard covers transformer-operated static meters of active energy in the classes 0.1S, 0.2S and 0.5S (IEC 62053-22:2020, scope). The 2006 text of the regulations named class 0.2S of that standard for the interface meter's active energy (Schedule Part II(1)(d), 2006).

A meter cannot measure better than the current and voltage it receives. The accuracy class of an instrument transformer is therefore not inferior to that of its meter (Schedule Part I(6)(a)). An interface meter of class 0.2S needs a CT metering core of class 0.2S. Its voltage transformer (VT) needs a metering winding of the matching class, class 0.2 in the IEC classes of voltage transformers. The metering classes of the cores, and the reason a metering core saturates slightly above its rated current, belong to the instrument transformers (Current transformers, Accuracy classes, Voltage transformers and CVTs, Accuracy classes).

The interface meter is a three-phase, four-wire static composite meter. It measures active energy, reactive energy and other quantities in one case (Schedule Part II(1)(a)). It connects to VTs with a rated secondary of 110 V between lines, and to CTs with a rated secondary of 1 A or 5 A, at a reference frequency of 50 Hz. It normally takes its power from the VT secondary circuits, with provision for an auxiliary supply (Schedule Part II(1)(h)).

The meter records active energy sent out from the substation's busbars with a plus sign, and energy received with a minus sign (Schedule Part II(1)(f)). It keeps 2 reactive energy registers. One counts while the average voltage is above 103 %, and the other while it is below 97 % (Schedule Part II(1)(e)). The main and the check meter connect to the same core of the instrument transformer (Schedule Part II(1)(j)).

4Availability-based tariff and time blocks

The availability-based tariff (ABT) is the tariff structure for which the interface meters were first specified. The 2006 regulations defined it as a tariff based on the availability of generating units (Reg. 2(1)(g), 2006). Its components were capacity charges, energy or variable charges, and charges for unscheduled interchange. The 2006 Schedule specified the interface meters as meters suitable for ABT (Schedule Part II(1)(a), 2006). The 2019 amendment omitted the definition, and the interface meter now stands on its own definition. The design's drawings keep the name ABT meter for the interface meter (In the design).

A time block is the interval for which the energy meters record their values. The Indian Electricity Grid Code of the Central Electricity Regulatory Commission defines it as a block of the duration the Commission specifies. The first block starts at 00.00 hours, and the duration is presently 15 minutes (Indian Electricity Grid Code 2023, Reg. 3(1), Sr. No. 127). A day therefore has 96 time blocks. The metering regulations record in blocks of 15 minutes, or of the duration the Commission specifies (CEA Meters Regulations, Schedule Part II(1)(b)). New meters can be reconfigured at site for a change of the time block (Schedule Part II(1)(l)).

For each time block, the interface meter stores the average frequency, the net active energy, the net reactive energy and the average voltage (Schedule Part II(1)(b)). At each midnight it stores the cumulative active energy and the 2 cumulative reactive energy registers. It marks the time blocks in which the VT supply failed on a phase. Its memory holds the data of at least the last 10 days. One port serves a common meter reading instrument, and another serves remote communication (Schedule Part I(3)).

The time block is also the unit of scheduling and settlement. The Grid Code defines a generating station's despatch schedule as its net output in MW and MWh for a time block (Reg. 3(1), Sr. No. 38). The regional load despatch centres process the interface energy meter data and coordinate the accounting and settlement of the regional pool account (Reg. 43(2)). The deviations from the schedule are settled through that pool account (Indian Electricity Grid Code 2023, Annexure 7, (1)(a)). The block-wise records of the interface meters are therefore the measured side of the plant's energy account.

5Revenue metering in the ANSI / IEEE set

The ANSI / IEEE set calls the meters at an interconnection revenue meters. ANSI C12.20 establishes the physical aspects and the performance criteria of electricity meters of the accuracy classes 0.2 and 0.5 (ANSI C12.20-2010, §1). In its load performance test, a class 0.2 meter keeps within 0.2 % of its reference registration over the load range. At the lowest test current the limit is 0.4 % (ANSI C12.20-2010, §5.5.4.3, Table 8). A meter of class 0.5 keeps within 0.5 % under the same test, and within 1.0 % at the lowest test current.

The instrument transformers of revenue metering follow IEEE C57.13. Its metering classes 0.3, 0.6 and 1.2 limit the transformer correction factor, and some makers offer the higher class 0.15 (RUS Bulletin 1724E-300 §5.10.3.1). The classes are explained with the CTs (Current transformers, Accuracy classes). Separately mounted CTs may be required for revenue metering, where the relaying CTs sit in the bushings of the breakers and transformers (RUS 1724E-300 §4.4.6). A combined instrument transformer, a VT and a CT in one free-standing unit, serves where a dedicated VT and CT are used for revenue metering (RUS 1724E-300 §5.10.8.1). Of the coupling capacitor voltage transformers, the extra-high capacitance type of class 0.3 suits revenue metering (Voltage transformers and CVTs, Accuracy classes).

6In the design

The design places the interface meters on the SLD and specifies the instrument transformer cores that feed them. It does not specify the meters themselves, their panels, or the meter data's communication to the load despatch centre, and the bill of materials has no meter line.

Meters on the SLD

The SLD draws a meter symbol, labelled with its role, on the metering core of the bay's CT. The line bay carries the main and the check meter, and the HV side of each ICT carries a standby meter (Bays and their equipment, Line bay, Bays and their equipment, Transformer bay). That is the arrangement of a generating station in Table 1 of the CEA metering regulations, with the ICTs in the place of the generator transformers. The meters and their leads are drawn on their own layer, in a dashed line of 0.18 mm (Graphical symbols, The legend). The SLD's note 3 states the arrangement, and for the default 220 kV project it reads, in full, “ABT meters: Main + Check at the 220 kV line bay, Standby on each ICT HV, on the metering cores of the CTs and CVTs.”

In a one-and-a-half breaker diameter, a circuit has no CT of its own, so its meters take the summated currents of the main and tie breakers' CTs. On a ring bus the meters take the summated CTs of the circuit's 2 breakers. A switching substation has the main and check meters on the lines of both its yards. The drawings of the ANSI / IEEE set draw revenue meters at the same positions: 2 on the line bay and 1 on the HV side of each transformer, each labelled REVENUE, with the legend entry Revenue meter. RUS 1724E-300 describes the meters and their connections (§13.3) and the instrument transformers of revenue metering (§4.4.6, §5.10.8.1, §5.11.5.4), and it places no meter. ANSI C12.20 sets the meters' accuracy classes, not their locations. The positions on these drawings are therefore the design's choice.

Cores and the checklist

The design's HV CT has 5 cores, 0.2S, 0.2S, 5P20, 5P20, PS. The 2 cores of class 0.2S are the metering cores, so the CT meets the class of the interface meter that the regulations ask. The CVT has the secondaries 0.2, 3P, open delta, of which the class 0.2 winding is the metering winding. The ANSI / IEEE set's CT has the cores 0.15B-1.8, 0.15B-1.8, C800, C800, C800, and its CVT the secondaries 0.15, 0.3, 1.2R. Their 2 class 0.15 cores feed the line bay's 2 revenue meters.

The CEA / Indian checklist has a metering item: interface (ABT) meters, main and check at the connection point and standby on the ICTs (CEA Meters Regulations, Reg. 7(1), Table 1; Reg. 8, Schedule Part I). The design meets it by its construction, and the item states the design fact. For the default project it reads: Main and Check meters on 1 line bay, Standby meters on the HV sides of 2 ICTs, 0.2S cores.

Example 1Interface meters of the default 220 kV project

Given: the default 220 kV project, with 1 line bay and 2 ICTs.

Main and check meters: 1 main meter and 1 check meter on the line bay, on the metering core of its CT.

Standby meters: 2 standby meters, one on the HV side of each ICT.

Result: the SLD shows 4 interface meters, and the checklist's metering item reads: Main and Check meters on 1 line bay, Standby meters on the HV sides of 2 ICTs, 0.2S cores.

Review questions
  1. State the difference between a check meter and a standby meter.
    Answer 1

    The check meter connects to the same instrument transformer core as the main meter, and the standby meter to another instrument transformer (Main, check and standby meters).

  2. Give the locations of the main, check and standby meters at a generating station.
    Answer 2

    The main and check meters sit on the outgoing feeders, and the standby meters on the HV side of the generator transformers and the station auxiliary transformers (Main, check and standby meters).

  3. Explain why the CT core of an interface meter is of class 0.2S.
    Answer 3

    The interface meter is of class 0.2S, and the accuracy class of an instrument transformer is not inferior to that of its meter (Accuracy classes).

  4. Name the quantities that an interface meter stores for each time block.
    Answer 4

    The average frequency, the net active energy, the net reactive energy and the average voltage, in blocks presently of 15 minutes (Availability-based tariff and time blocks).

  5. Find the interface meters of the default 220 kV project.
    Answer 5

    The line bay carries 1 main and 1 check meter, and the ICTs carry 2 standby meters (Example 1).

Sources

[1]CEA Meters Regulations, Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006.

[2]Indian Electricity Grid Code 2023, Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.

[3]IEC 62053-22:2020, Electricity metering equipment, Particular requirements, Part 22: Static meters for AC active energy (classes 0,1S, 0,2S and 0,5S).

[4]ANSI C12.20-2010, ANSI C12.20-2010, American National Standard for Electricity Meters, 0.2 and 0.5 Accuracy Classes.

[5]RUS Bulletin 1724E-300, Design Guide for Rural Substations.

[6]IEEE C57.13-1993, IEEE Standard Requirements for Instrument Transformers.

Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.

CitationSubstationLayout Reference, Tariff and revenue metering, revision 3, 9 Nov 2026, https://substation.solarlayout.app/library/reference/tariff-and-revenue-metering