Protection detects a fault or an abnormal condition on a part of the power system and removes that part from service. It does this through relays, which measure the currents and voltages of the part and command its circuit breakers to open. This topic explains how a network is divided into zones of protection, and why the zones overlap at the breakers. It then explains the qualities a protection system must have, the main and backup protection, and the chain of devices from the current transformer to the breaker. It closes with the device numbers that name the relays on a diagram, and with what the design specifies for the protection.
Before this topic: Current transformers · Circuit breakers · Faults and fault current
1The task of protection
Protective relays detect defective lines or apparatus and start the operation of circuit-interrupting devices to isolate them (RUS Bulletin 1724E-300 §12.1.1). They also detect abnormal operating conditions that are not caused by a defect, and either give an alarm or trip. The aim is to limit the damage to the equipment and to keep the rest of the network in service.
The most common cause of a trip is a short circuit, which raises the current and lowers the voltage (Faults and fault current, What a fault is). Other conditions that protection detects are excessive heating, overvoltage and undervoltage, unbalanced phases, abnormal frequency, abnormal pressure inside oil-filled equipment and a loss of synchronism between machines (RUS 1724E-300 §12.1.3). A short circuit must be cleared in a fraction of a second. A slow condition, such as overheating, may first raise an alarm and trip only if it persists.
The CEA Connectivity Regulations 2007 state the task for a network connected to the Indian grid. The protection detects faults within its protection zone and isolates the equipment automatically (CEA Connectivity Regulations 2007, Schedule Part I, 6(1)). It also detects abnormal operating conditions such as equipment failures and open phases.
2Zones of protection
A network is divided into zones of protection. Each zone of protection covers one element: a line, a bus, a transformer or a reactor. The protection of a zone trips the breakers that bound the zone, and no others. A fault inside the zone therefore removes that element and leaves the rest of the network in service. The current transformers (CTs) define the boundaries of a zone, because the relays of the zone measure the currents at those points. A bus differential protection, for example, protects the zone bounded by the CTs connected to it (Behrendt, Costello and Zocholl §II.A).
Figure 1 shows the zones of a line, a bus and a transformer. The bus zone and the line zone meet at the line breaker, and the bus zone and the transformer zone meet at the transformer breaker. To leave no part of the network outside a zone, adjacent zones overlap at the breaker between them.
3Overlap at the breaker
The overlap is made by the placement of the CTs. Where the breaker is to lie in both the bus and the line zones, the bus protection CTs are on the line side of the line breaker. The line protection CTs are then on its bus side (Behrendt, Costello and Zocholl §IV). A fault on the breaker itself then lies in both zones. Both protections trip, and the fault is cleared although more breakers open than for a fault elsewhere. The same holds for a bus-section breaker whose CTs overlap the 2 bus zones: a fault between those CTs unbalances both zones, and the breakers of both sections trip (Martin and others §III.A).
Where the protections of 2 zones share one set of CTs on one side of the breaker, the zones meet at the CT and do not overlap. A fault between the breaker and the CT is an end-zone fault, and the bays of the design meet this case (Busbar and breaker failure protection, In the design). The bus protection detects it as an internal fault and opens the bus breakers, but a source at the remote end of the circuit still feeds the fault. The relay logic then finds the breaker open with current still flowing in its CT, and sends a transfer trip to the remote breaker (Behrendt, Costello and Zocholl §II.B).
4Requirements of protection
A protection system is judged by 5 qualities: reliability, selectivity, speed, sensitivity and simplicity. The CEA Connectivity Regulations 2007 require a standard protection system for each element of the power system, with the required reliability, selectivity, speed, discrimination and sensitivity (CEA Connectivity Regulations 2007, Schedule Part I, 6(2)). RUS 1724E-300 §12.1.2 names dependability, security, speed and simplicity. The qualities conflict, and the setting of a protection balances them.
Reliability. Reliability has 2 parts. Dependability is the certainty of correct operation in response to a fault (RUS 1724E-300 §12.1.2.1). Security is the ability to avoid an operation when no operation is wanted, for a fault outside the zone or for a normal condition (RUS 1724E-300 §12.1.2.2). A sensitive and fast relay is dependable, but it is more exposed to false operation. Adding a second protection raises the dependability, and a requirement that 2 protections agree raises the security.
Selectivity. Selectivity, or discrimination, is the operation that isolates the smallest part of the network needed to clear the fault (RUS 1724E-300 §12.1.2.1). Coordination is the process that ensures that only the elements that must be removed are tripped, in the shortest time possible (RUS 1724E-300 §12.4.6).
Speed. Speed means clearing the faults in the shortest possible time, with due regard to dependability and security (RUS 1724E-300 §12.1.2.3). A fault cleared in a short time limits the heating and the mechanical forces on the equipment, and it keeps the generators of the network in step. The maximum fault clearance time is 100 ms for the 765 kV and 400 kV systems. It is 160 ms for the 220 kV and 132 kV systems (CEA Grid Standards Regulations 2010, Reg. 3(1)(e), Table 4).
Sensitivity. Sensitivity is the smallest change of the measured quantity to which the protection responds (Nordström, Power System Protection, slide 24). A fault at the far end of a long line, or a fault through a high resistance, draws a small current, and the protection must still detect it. The relays must also operate at the minimum generating conditions of the network, for faults at the far end of their sections (RUS 1724E-300 §12.4.6).
Simplicity. A relaying system should be no more complex than the application requires. Equipment added beyond good coverage adds to the chance of failure and misoperation (RUS 1724E-300 §12.1.2.4).
5Selectivity by grading and by comparison
Protection reaches selectivity in 2 ways. A graded protection measures at one end of its zone and responds to a fault beyond the zone as well. An overcurrent relay responds to the magnitude of its current, and a distance relay to the impedance from its location to the fault (Line protection, Distance protection). Graded relays are made selective by time. A relay farther from the fault has a time delay long enough for the relay nearer the fault to clear it first.
The time delay of the remote relay equals the operating time of the near relay, plus the opening time of its breaker, plus a margin. RUS 1724E-300 §12.4.6 takes the margin as approximately 25 % of the combined relay and breaker time, at least 6 cycles, if the relays are normally field calibrated at the calculated setting. It takes 0.2 s to 0.3 s where the relays are not calibrated in the field at their settings.
A unit protection compares the quantities at all the boundaries of its zone. It responds only to a fault inside the zone, so it needs no time coordination with the relays of other zones (RUS 1724E-300 §12.4.6). Differential protection is the main form of unit protection.
6The differential principle
Kirchhoff's current law states that the currents entering a node add to zero. A differential protection applies this to its zone: the currents measured at the boundaries of a healthy zone add to zero, for load and for a fault outside the zone (RUS 1724E-300 §12.3.5). A fault inside the zone draws a current that leaves through the fault, so the sum is no longer zero. Transformer protection, Differential protection and Busbar and breaker failure protection, Low-impedance bus differential apply the principle to the transformer and the bus.
The measured currents differ by the CTs' errors even in a healthy zone, because the CTs have errors and can saturate during a heavy external fault (Current transformers, Saturation and its effect on protection). A percentage differential relay therefore compares the difference of the currents with their total. It forms an operate current from the phasor sum of the currents, normalised to a common base:
It forms a restraint current from the sum of their magnitudes:
| operate current, the magnitude of the phasor sum of the zone's currents | A | |
| restraint current, the sum of the magnitudes of the zone's currents | A | |
| current measured at the boundary of the zone, in phasor form | A | |
| number of current inputs bounding the zone |
The relay operates when the operate current exceeds a minimum pickup and a set percentage of the restraint current. The percentage is the slope of the characteristic (Figure 2). A heavy external fault raises the restraint current, so a CT error that grows with the current does not cause a trip. This restraint is also called bias.
7Main and backup protection
A protection can fail, through a failed relay, an open trip circuit, a lost direct current (DC) supply or a breaker that does not open. Backup protection clears the fault when the main protection or its breaker fails. The CEA Connectivity Regulations 2007 require an additional protection as backup, besides the main protection, where the failure of a relay has a substantial impact on the grid (CEA Connectivity Regulations 2007, Schedule Part I, 6(2)).
Backup is either remote or local. Remote backup is a protection at the remote substation that also covers the next element, such as the third zone of a distance relay or a time overcurrent relay. It has no knowledge of when the local breaker was commanded to open, so it must wait longer than the local protection (PSRC summary of the breaker failure guide §II). It is simple, but it removes more of the network and is slower. It may also fail to detect a fault at the far end of a long adjacent line (RUS 1724E-300 §12.4.4.3).
Local backup is in the same substation. One form is a second set of relays, which backs up the failure of a relay. RUS 1724E-300 §12.4.4.3 notes that at 69 kV and above the breakers often have 2 trip coils, fed by primary and secondary relays from 2 DC trip buses, often supplied from a common battery. Duplicated relays do not cover a breaker whose mechanism fails to open. That case is the task of the breaker failure protection, which trips the adjacent breakers (Busbar and breaker failure protection, Breaker failure protection). Local breaker failure protection is more sensitive and more selective than remote backup (PSRC summary of the breaker failure guide §II).
8The protection chain
A protection works through a chain of devices, and a fault is cleared only when each link works. Figure 1 shows the first link, the CTs. The chain, in its order:
- Instrument transformers. CTs and voltage transformers (VTs) give the relays copies of the primary currents and voltages (Current transformers, Voltage transformers and CVTs). A protective CT core must reproduce the fault current without saturating in the time the relay measures.
- Relay. A relay has an input module, which conditions the currents, voltages and contact inputs, a decision module, which compares them with the settings, and an output module, which closes the trip contacts (RUS 1724E-300 §12.3.1). Microprocessor relays typically operate in 1.5 to 2 cycles (RUS 1724E-300 §12.3.2.4).
- Trip circuit. The relay's contacts energise the breaker's trip coils, directly or through auxiliary and lockout relays. A lockout relay trips the breakers and holds them open until it is reset, so the element is not reclosed onto a fault (RUS 1724E-300 §12.3.5).
- Circuit breaker. The breaker interrupts the current at a current zero (Circuit breakers, The arc and its interruption). Its break time adds to the relay's time in the total clearing time.
- DC supply. The relays and the trip coils take their energy from the substation battery, so a fault can be cleared when the alternating current (AC) supply is lost (DC system, The DC system).
9Device function numbers
A device on a protection or control diagram is named by its function number. IEEE C37.2 assigns the numbers 1 to 94, as RUS 1724E-300 Appendix F reprints the 1996 edition. RUS 1724E-300 Appendix G reprints the suffix letters, which add detail. They include BF for breaker failure, N for a device connected in the residual circuit of the CTs, and G for a device whose measured quantity is in the path to earth. The numbers of this part of the library:
| Number | Device |
|---|---|
| 21 | Distance relay |
| 24 | Volts per hertz relay |
| 26 | Apparatus thermal device |
| 49 | Machine or transformer thermal relay |
| 50 | Instantaneous overcurrent relay |
| 51 | AC time overcurrent relay |
| 52 | AC circuit breaker |
| 57 | Short-circuiting or grounding device |
| 63 | Pressure switch |
| 67 | AC directional overcurrent relay |
| 79 | Reclosing relay |
| 85 | Carrier or pilot-wire relay |
| 86 | Lockout relay |
| 87 | Differential protective relay |
| 89 | Line switch |
| 94 | Tripping or trip-free relay |
A relay that performs several functions carries their numbers together. An overcurrent relay with instantaneous and time elements, for example, is 50/51. 50BF is the current detector of a breaker failure protection, and 86BF the lockout relay it operates (PSRC summary of the breaker failure guide §III). The primary devices on the single-line diagram (SLD) of the ANSI / IEEE set carry the same numbers (Graphical symbols, Symbols and designations).
10In the design
SubstationLayout sets no relays. It draws no relay on the SLD, has no line for relay panels in the bill of materials (BOM) and makes no protection coordination study. It does specify the parts of the protection chain that belong to the primary design, and it lists the protection requirements on the compliance checklist.
Instrument transformers. The design's high-voltage (HV) CT has 5 cores, 0.2S, 0.2S, 5P20, 5P20, PS. The 2 class 5P20 cores and the class PS core feed the protection relays (Current transformers, In the design). The capacitor voltage transformer (CVT) has the secondaries 0.2, 3P, open delta, of which the class 3P secondary serves the protection (Voltage transformers and CVTs, In the design).
Key diagram. The electrical key diagram numbers the bays and tags the primary devices. On the POWERGRID format, the default of the IEC + CEA / CBIP set, the breaker is 52, and the isolator (disconnector, IEC 60050) tags are 89A, 89B and 89L, after the bay number. On the IEEE format of the ANSI / IEEE set, the grounding switch is 57. The key diagram prints no relay numbers.
DC supply. The DC system's duty cycle trips the HV breakers and the medium-voltage (MV) breakers in its first minute, with 5 A per HV breaker for its 2 trip coils. Its continuous load includes 150 W per HV bay for the relays, the supervisory control and the indication (DC system, The duty cycle). The default project has 2 batteries, each with its charger, as the grid code requires for a substation of 132 kV and above (CEA Connectivity Regulations 2007, Schedule Part III, 6(b)).
Compliance checklist. The CEA / Indian checklist of the IEC + CEA / CBIP set has a Protection item: line, interconnecting transformer (ICT) and bus protection per the grid code, with duplicated main protection at 220 kV. The same list has an item for the protection settings and coordination study. It cites the CEA Connectivity Regulations 2007, Schedule Part I, 6(2) and 6(6), and the IEC 60255 series of measuring relays and protection equipment. Clause 6(2) requires a standard protection system with the required reliability, selectivity, speed, discrimination and sensitivity, and a back-up protection where a relay failure in the requester's system has a substantial impact on the grid. Clause 6(6) leaves the protection co-ordination to the Regional Power Committee. These items have no automatic check, and each reads Needs your answer until the user answers it.
- Explain why adjacent zones of protection overlap at a circuit breaker.
Answer 1
With the CTs of each zone on the far side of the breaker, a fault on the breaker lies in both zones and no part of the network is left unprotected (Overlap at the breaker).
- Distinguish dependability from security.
Answer 2
Dependability is the certainty of correct operation for a fault, and security is the ability to avoid an operation that is not wanted (Requirements of protection).
- State the maximum fault clearance times that the CEA Grid Standards Regulations 2010 set.
Answer 3
The maximum is 100 ms for the 765 kV and 400 kV systems and 160 ms for the 220 kV and 132 kV systems (Requirements of protection).
- Give the operate and restraint currents of a percentage differential relay.
- Compare local and remote backup protection.
Answer 5
Remote backup at the next substation is simple but slower and removes more of the network, and local backup in the same substation is more sensitive and more selective (Main and backup protection).
- Name the devices with the numbers 21, 52, 86 and 87.
Answer 6
The distance relay, the AC circuit breaker, the lockout relay and the differential protective relay (Device function numbers).
[1]RUS Bulletin 1724E-300, Design Guide for Rural Substations.
[2]CEA Connectivity Regulations 2007, Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007.
[3]CEA Grid Standards Regulations 2010, Central Electricity Authority (Grid Standards) Regulations, 2010.
[4]IEEE C37.2-1996, Standard Electrical Power System Device Function Numbers.
[5]Behrendt, Costello and Zocholl, Considerations for Using High-Impedance or Low-Impedance Relays for Bus Differential Protection. §II.A.
[6]Martin and others, Bus Protection Considerations for Various Bus Types.
[7]PSRC summary of the breaker failure guide, Summary of Revision, IEEE C37.119-2016, Guide for Breaker Failure Protection of Power Circuit Breakers.
[8]IEEE C37, the protection guides C37.113, C37.91 and C37.234.
[9]Nordström, Power System Protection, Lecture 4: Power System Protection.
[10]IEC 60050-441, International Electrotechnical Vocabulary, Part 441: Switchgear, controlgear and fuses.
[11]IEC 60255, Measuring relays and protection equipment.
Reference topics explain the methods of the standards for study. For a design, apply the standards and regulations in force.